Second Year
Week 7
Long time between updates. At the end of Jan I took off for close to a week to help my inamorata celebrate her birthday. During the first week of Feb I came down with the crude, a fever and cough that is very trying. Several friends have had it and all agree it sucks. It goes on forever and it takes time to get strength back. I pretty well lost all of February. I am going to try and tell all that has been done since.
I cleaned up the kitchen drawers and the top one was very short because it fit in before the sink drain. I pulled off the face and made a full length drawer with it.
Kitchen drawers with short drawer face
Kitchen drawers with new full length drawer
I cleaned up the icebox panels and fiberglassed the door openings. I made a new door.
Fiberglassed door openings
New door
I primed a lot of the interior that hadn't been finish painted yet.
Settee area primed
Quarter berth
The week was so long ago I can't remember any of the other things I did.