Second Year

Week 9

We got in a solid 7 weeks in March and April but I am only going to do three pages, the first is going to cover the mast. When I took the mast down and disassembled it last year it was looking pretty bad, here are some of before pics.

The Corrosion at the Through Deck Boot Ring

bootring corrosion

The Mast Tip

mast tip

Spreader Tip

spreader tip

With the bare mast on its supports we started cleaning up. We used an aircraft paint stripper and the random orbital sander to clean it up. We also got the boom, spinnaker pole, spreaders and sail track stripped. Here is the mast in shiny clean aluminium ready for chemicals all 53' of it.

The cleaned mast

shiny mast

We prepared the mast for paint using Alumaprep , then rinsing with fresh water and then Alodyne and rinsing in fresh water. Then enter the Paint God in his suit of lights. Here Chris is starting to prime.

The Paint God paints

priming starts

Here is a pic of the second finish coat going on. We used the same paint as what is on the topsides, Dupont Imron in an off white colour.

Second Coat

second coat

Here is the paint farm with boom and pole hanging on the right and in the back ground a table with different parts including the steering pedestal.

The Paint Farm

paint farm

The mast got moved back over behind the boat, we got the parts back on except for the spreaders, standing and running rigging and mast head stuff. This project soaked up two weeks at least. Here is a pic showing some of the stuff back on

Mast with Parts

mast with parts attached